UABgridBootCamp: Difference between revisions
Jump to navigation
Jump to search
Jpr@uab.edu (talk | contribs) (Initial draft of user session.) |
Jpr@uab.edu (talk | contribs) (Add requirements) |
||
Line 6: | Line 6: | ||
* The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid | * The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid | ||
* The third section would be an example grid-based workflow, eg. DynamicBlast | * The third section would be an example grid-based workflow, eg. DynamicBlast | ||
= Requirements = | |||
* UABgrid IdM | |||
* UABgrid GridShib CA | |||
* UABgrid stage running GridWay | |||
* UABgrid file grid |
Revision as of 20:07, 24 July 2007
Proposed structure
The grid part of the bootcamp will be about 1.5 hours. Were thinking to break it down in 3 roughly equal sections.
- The first section will be an overview of grid and uabgrid in particular. Should cover how to authn and such.
- The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid
- The third section would be an example grid-based workflow, eg. DynamicBlast
Requirements
- UABgrid IdM
- UABgrid GridShib CA
- UABgrid stage running GridWay
- UABgrid file grid