UABgridBootCamp: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
Jpr@uab.edu (talk | contribs)  (Initial draft of user session.)  | 
				Jpr@uab.edu (talk | contribs)   (Add requirements)  | 
				||
| Line 6: | Line 6: | ||
* The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid  | * The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid  | ||
* The third section would be an example grid-based workflow, eg. DynamicBlast  | * The third section would be an example grid-based workflow, eg. DynamicBlast  | ||
= Requirements =  | |||
* UABgrid IdM   | |||
* UABgrid GridShib CA  | |||
* UABgrid stage running GridWay  | |||
* UABgrid file grid  | |||
Revision as of 20:07, 24 July 2007
Proposed structure
The grid part of the bootcamp will be about 1.5 hours. Were thinking to break it down in 3 roughly equal sections.
- The first section will be an overview of grid and uabgrid in particular. Should cover how to authn and such.
 - The second section would concentrate on interacting with the grid using gridway -- our exposed cmdline interface to the grid
 - The third section would be an example grid-based workflow, eg. DynamicBlast
 
Requirements
- UABgrid IdM
 - UABgrid GridShib CA
 - UABgrid stage running GridWay
 - UABgrid file grid